One team. The full project chain.
We choose the correct procedure, assemble the design, coordinate engineering disciplines and manage the EHR process.

Building permit / building notice
Correct procedure, design and EHR submission.
Read more ↗02Use permit / use notice
Evidence, audits, as-built information and procedure.
Read more ↗03Building legalisation
Aligning registry data with the actual situation.
Read more ↗04Apartment alteration
Plans, structures, ventilation and approvals.
Read more ↗05House and ancillary building
New construction, extension, reconstruction and 3D.
Read more ↗06Audits and inspections
Mapping deficiencies and preparing for a use permit.
Read more ↗07Structural design
Foundations, load-bearing structures, details and calculations.
Read more ↗08Water and sewerage
Design of internal and external water and sewerage networks.
Read more ↗09Heating and ventilation
Heating, ventilation and, where required, cooling solutions.
Read more ↗10Electrical and low-voltage
Coordination of electrical and low-voltage solutions.
Read more ↗11Fire safety
Fire-safety design, separation distances, evacuation and rescue access.
Read more ↗12Energy efficiency
Coordination of energy-efficiency source data for the project.
Read more ↗Engineering disciplines should not live separately from architecture.
Structures, water and sewerage, heating and ventilation, electrical systems, fire safety and energy efficiency are coordinated with the architectural core.
- Structural design
- Water and sewerage
- Heating, ventilation and cooling
- Electrical and low-voltage
- Fire safety
- Energy efficiency
Do you have a property, official comments or an EHR procedure?
Send us the source information. We first determine the required result and which documents are actually necessary.