UNTWERP · Use permit

A completed building needs complete documentation.

We compare the design with the actual situation, compile evidence and bring the EHR procedure to a logical conclusion.

Kasutusluba
Approach

The actual situation must match the documents.

A use permit is not one universal list of PDFs. The required package depends on the property, building permit, construction history and the actual completed solution. We start by mapping missing evidence.

Document auditWhat is in EHR, what the owner has and what is missing.
Property comparisonThe design solution is compared with the actual construction.
EvidenceCertificates, audits, surveys, photos and as-built documents.
ProcedureEHR application, responses and corrections through completion of the stage.

The exact procedure is determined after reviewing the property and source data.

Kasutusloa.ee

A dedicated use-permit process guide

kasutusloa.ee explains the permit journey through EHR. At UNTWERP, the same service is integrated with the full design process.

Open kasutusloa.ee ↗
Is the same document package always required?

No. The package depends on the building, previous documents, actual changes and the procedure of the specific local authority.

What if the construction differs from the approved design?

First we record the differences. Then we determine which changes can be reflected through a design revision and which require a separate procedure.

Do you have a property, official comments or an EHR procedure?

Send us the source information. We first determine the required result and which documents are actually necessary.